Legalisation and Tolerated Status of Buildings
The absence of a notarial deed for a building does not necessarily mean that it is unlawful, just as its presence on the cadastral map proves neither lawfulness nor ownership. The first step is to establish the basis of ownership of the land and building, the year of construction, use, construction papers and the applicable detailed development plan. Acquisition of land under paragraphs 4a or 4b of the transitional provisions of the Agricultural Land Ownership and Use Act does not automatically make every building lawful or tolerated.
Bulgarian law distinguishes lawful, tolerated and unlawful construction. Tolerated status is not retroactive legalisation, and a certificate of tolerated status does not replace a building permit, a use permit or a title document. Under paragraph 16 of the transitional provisions of the Spatial Development Act and paragraph 127(1) of the transitional and final provisions to its amendment, certain buildings without construction papers, erected within the statutory periods and permissible under the rules in force when built or under the current rules, are not subject to removal or prohibition of use. For construction under paragraph 127(1), the cut-off date is 31 March 2001.
The competent municipal or district authority examines the specific building before issuing a certificate. The usual documents include an application, title document, current cadastral sketch or scheme, geodetic survey, evidence of the construction date, and opinions or plans prepared by qualified professionals. The exact set, fee and need for a structural opinion depend on the category, type and location of the construction and the rules of the relevant authority. A neighbour’s notarised consent is not a universal requirement and cannot replace statutory setbacks.
Where the conditions for tolerated status are met, the building may be transferred upon presentation of the certificate, but this does not resolve ownership disputes or automatically permit alteration, extension or additional storeys. Cadastral and tax records are corrected in separate proceedings. If the building does not qualify as tolerated and no legalisation procedure applies, removal proceedings may follow.
This article is not a legal opinion or advice on a specific case. Before applying, the title documents, municipal archive, cadastral information, date and permissibility of the construction should be reviewed with an architect, surveyor and lawyer practising in property and planning law.